projects
> roofing
systems > Wager Street & Portia Way
A project of 3 phases totalling approximately 9000m2 of a housing
complex in East London. System 600 was specified, with a tapered insulation
scheme to help aid the drainage of water from the roofs.
The project was specified by London Borough Of Tower Hamlets and installed
by Marley Waterproofing Approved Contractor FH Breyer Asphalte. The
cost effectiveness and durability of the System 600 Roofing Membrane
along with the Technical back up service, and on site policing ensured
that this large project completed smoothly, and ensured a watertight
roof.